Friday, November 27, 2009

snail pace on the highway

It was a long drive from KL to the north last night. We started our journey at 8pm and reached the Sg Buloh rest area at 9pm. A quick dinner at Burger King we thought and maybe we could continue when the traffic subside. BBBZZTTT.. wrong answer. Traffic is still heavy and we thought maybe it would be better to exit at Sg Buloh, to Guthrie highway and join the jam at Rawang... yea yea yea.. snail pace till Ipoh, even slower up the Menora Tunnel and Kuala Kangsar. It was only after Bukit Merah that the speedometer can reach 140km/hr and that was at 1:45am. Finally reached Sg Petani at 3am. Total journey time: 7 hours (meal break 1 hr, driving time 6 hrs).
(around Menora tunnel right after Ipoh - 1am)

Selamat Hari Raya Idul Adha

No comments:

GoogleAd

LinkWithin

Related Posts Plugin for WordPress, Blogger...